Hi Lingaiah,
If using 0 in product master period factor is not creating planned order in the start of the month. Please check your period factor in the PDS, if a period factor is maintained there, then SNP heuristic consider that first and product master period factor is ignored.
Note: If there is no period factor maintained, the system uses 0.5 as default.
Regards,
Umesh