Hi Deepak,
The system uses the valuation segment at plant level. hence it will uses valuation class and value from the material/plant. Cost estimate does not use valuation at value type level.
I think this is only possible if you use SAP IS/AFS.
The header segment (material/plant) value is average of the different value type, so your costing is kind of mixed.
Regards
Ali