Re: block inspection lot for processing

$
0
0

This is an unusual request.  You basically want to block all results recording and UD's if a a single inspection lot is past the Inspection end date?   Do I have that right?

 

Off-hand, that is not something that is typically done unless you are using a very special type of production and then it is only enforced per material.  Not across the board.

 

The only way you could do such a thing across the board would be to use a user exit that is accessed when trying to do results recording or making a UD. Maybe the following two?

 

 

QEEM0003

User exit: add. functions after valuating insp. characs

 

QEVA0006

Entry to usage decision transactions

 

It would be difficult as you can't block any lots that are overdue as otherwise you wouldn't be able to resolve the issue without using QA02 to change the end date of the inspection lot. 

 

You would also need security around QA02 as since lab folks normally have access to that, any one could go in and change the end date of the inspection lot.  This would not be what you want but in reality, if they need to get product out the door, the end date will be changed.

 

FF