Did you check the PRT functionality?
Please refer following scenario.
1.Add the PRT view for LAB chemical in material master
2.Create an inspection characteristic which should be checked 'test equipment assignment' in control indicator
3.Add the LAB chemical, QTY to PRT data in operation of inspection plan and assign it to the inspection characteristic (in reference data)
Then you can see the PRT data at result recording for this inspection characteristic.
But unfortunately SAP doesn't provide the consumption process for PRT material.
Therefore you need additional GI process using follow-up action of UD or manual MB1A.
Regards, DoWook KIM