Hi Santosh,
Thanks for the reply. My scenario is I am getting the material from customer for repair. So I should create repair order w.r.t service notification. After creating repair order, I should create return delivery (LR).
In this scenario i don't have service material. If material no 1808 is delivered to the customer, I need to get the same material back to the plant for the repair.
If IRRS is not the right item category what is the right item category.
I dont have any serviceable item. In my scenario IRRS is not serviceable item.
What should be the setting for VORP (Repair processing). Any idea?
Is this configuration is right? Please suggest.
Thanks,
C Chaitanya