Hi Ask,
Yes you are right
PV which we assigned in costing and will calculate the standard price. So our inventory value will always calculate based on default prod.version. If we not assign any default PV, system will consider the very first one
System will take first production version by default if lot size is same and it is not locked.
If we use different production version while doing production confirmation, whether system will calculate the price dynamically? Please clarify.
System will take cost from the BOM and routing assigned to that production version in order. If there cost difference then it will hit price difference account.
Regards,
R.Brahmankar